07Tokens as Grid Load
How much grid load does AI add in Europe?
Data updated 6 Nov 2026
Google's latest disclosure (30 September 2025) works out to about 43 trillion tokens a day, counted as tokens across all its products (surface tokens), the largest published figure of any company.
Its separate API (developer) count (29 October 2025) is a different slice, about 10 trillion tokens a day.
OpenAI's latest API (developer) disclosure (6 October 2025) puts it at about 8,6 trillion tokens a day.
The series cannot be added: each company counts something different, so the chart keeps one line per company and definition and shows no total.
Take Google's disclosed surface tokens and multiply by an assumed energy per token: the result is roughly 0,4 to 91 TWh a year, 7,5 TWh at the median, an average draw of about 860 MW.
For scale, the IEA's modelled figure for all the world's data centres in 2025 is 485 TWh; Ireland's metered data-centre draw is the other reference line.
An illustrative estimate: a disclosed volume multiplied by an assumed energy per token. It measures no company's electricity use; read the whole range.
Dotted lines are company figures, self-reported. A hollow point was converted from prompts or words with a stated factor.
Questions
How much electricity would Google's disclosed token volume need?
Roughly 0,4 to 91 TWh a year, 7,5 TWh at the median, when the surface tokens Google disclosed on 30 September 2025 are multiplied by an assumed energy per token. The median is an average draw of about 860 MW. This is an illustrative estimate that measures no company's electricity use, so read the whole range.
Can the token counts of different AI companies be added together?
No. Google's latest disclosure (30 September 2025) works out to about 43 trillion tokens a day, counted as tokens across all its products (surface tokens); OpenAI's latest API (developer) disclosure (6 October 2025) puts it at about 8,6 trillion tokens a day. Each company counts something different, so the chart keeps one line per company and shows no total.
How these numbers are made: Implied data-centre load.
Get an email when this section changes.