Capacity stress and the long-duration auction

What it measures

How tight Germany's supply gets in its worst hours, what the first long-duration round awarded, and the cost range the Commission expects.

Inputs

  • Residual load (demand left after wind and solar) and low-wind-and-sun spells for the DE-LU bidding zone (Germany and Luxembourg, which share one wholesale price), from the Mismatch and Dunkelflaute builds on ENTSO-E data
  • The capacity law's tender volumes and contract terms, the regulator's published result of the first round, and the cost range in the European Commission's state-aid approval, each with its citation

Method and weighting

The stress indicators come from the Mismatch and Dunkelflaute builds: the highest residual load of the window, and the longest run of hours with little wind and sun.

The auction block reads a curated file. It holds the volumes and terms the law sets, the first round's result as the regulator published it (bids, awards, the price per megawatt and year, the ceiling), and the Commission's expected cost range.

The page sets the award value beside the ceiling and the tendered volume and states each in its own unit.

Window

The stress indicators cover the rolling 12 months to the data date, refreshed on the 1st and 15th of each month. The cost range covers the delivery years from the target year to the end of the contracts. Data last refreshed on .

Known limits

  • The cost is the European Commission's expected range, and the consumer levy stays an estimate until its own law sets it.
  • The award value says what winners are promised per megawatt and year; it describes the first round and each later round sets its own result.

Used on

Sources: ENTSO-E, Bundesnetzagentur. Each is described on the Data sources page.