Method note · estimate
Curtailment cost at a reference price
What it measures
The regulator's quarterly congestion volume and cost, as published, beside Wattlas's estimate of curtailed energy valued at one reference rate.
Inputs
- Redispatch records from netztransparenz.de, the German grid operators' joint data site, for German renewable plants told to turn output down, in megawatt-hours
- A reference compensation rate, stated in the data file and on the view
- The Bundesnetzagentur's quarterly report on congestion management, published on SMARD: measure volume in gigawatt-hours, cost in million€, the compensation paid to curtailed renewable plants, and the share of renewable redispatch caused by distribution grids, copied into a curated file
Method and weighting
Curtailment is wind and solar switched off because the grid cannot carry the power it would generate; redispatch is the grid operator paying a plant to turn down on one side of a congested line and up on the other. The curtailed energy for a day is the total volume of redispatch measures that reduce feed-in from a renewable plant, summed for that day.
The cost is that curtailed volume multiplied by a reference compensation rate, a single figure stated in the data file and on the view standing in for the range of rates plants are paid.
The view shows two series and says which is which. The official series is the regulator's quarterly figure for Germany: the volume of every congestion measure, the total cost, the compensation paid to curtailed renewable plants and the renewable energy turned down, each as published. The estimate is Wattlas's own sum over the redispatch feed, valued at the reference rate. The official series is the one to quote for what was paid; the estimate is the one that runs to the latest day and shows each day. A verification band divides the estimate's quarterly energy by the regulator's renewable volume for the same quarter, for every quarter the estimate covers in full, and accepts the range set in pipeline/congestion_quarterly.json.
Window
The estimate covers the two years to the latest day the redispatch records cover, refreshed on the 1st and 15th of each month. The official series runs quarter by quarter from the first quarter the file holds to the latest published quarter, about one quarter behind, and is reviewed once a quarter. The current window runs from to . Data last refreshed on .
Known limits
- Real compensation varies by plant and year, so this figure is an order-of-magnitude proxy for the billed amount.
- The redispatch records give the volume of energy curtailed and leave out the compensation paid.
- The regulator's quarterly volume and cost cover every congestion measure, conventional plants turned up or down included; curtailed wind and solar are one part of it.
- The regulator revises its figures, and costs are provisional at first, so a quarter can change after publication. The estimate sits below the regulator's renewable volume, because the regulator's figure adds measures caused in distribution grids.
Used on
- Curtailment in Geography of Price
- Curtailment Cost in The Bill
Sources: netztransparenz.de, SMARD. Each is described on the Data sources page.