Method note · target
Data-centre rules tracker
What it measures
How the rules for data centres on the grid are chosen, summarised and kept current: one row per official document, re-read at its source every month.
Inputs
- The official text of each instrument: a law, a regulator's decision, a ministerial direction, a parliamentary resolution or a published draft
- The legislature's or ministry's own record of where each instrument stands
Method and weighting
Each row is one public instrument that sets a condition on data centres connecting to or building near the electricity grid. Its sentence summarises what the instrument asks, in plain words, from the instrument's own text; a news report is never the source.
The status is read from the issuer's own record: a draft is published for comment, an agreed row is a political agreement or a parliamentary resolution, an adopted row has passed, and an in-force row applies today. Adopted and in-force rows are drawn solid; drafts and agreed rows are drawn dashed.
Every row carries the date it was last re-read. The builder refuses to publish a row older than the limit set in the tracker's configuration, so a rule that has moved on cannot stay on the page unchecked.
Window
As of the re-read date printed on each row; every row is re-read at its source on the first of each month. Data last refreshed on .
Known limits
- A summary leaves out conditions, exemptions and transitional rules; the linked text is the authority.
- Rules set by a city or a grid operator are left out; the tracker holds national, devolved and EU instruments.
- A row changes only when a person re-reads its source, so a change can sit unreported for up to a month.
Used on
- Who Gets Connected in The Load
Sources: MITECO, Folketinget, Danish Ministry of Climate, Energy and Utilities, Scottish Government, Scottish Parliament, Commission for Regulation of Utilities, Bundestag, Staatsblad, EUR-Lex. Each is described on the Data sources page.