04Forecast Error
How far does the wind and solar forecast miss?
Data to 2 Nov 2026 · next refresh 15 Nov 2026
In the 12 months to 2 November 2026, the grid operators' day-ahead forecast of German onshore wind output missed by 10% of what was generated, offshore wind by 17% and solar by 7% (SMARD).
In the four control areas (each the region one grid operator balances), the onshore wind forecast missed by between 11% and 26%; misses in different areas partly cancel in the national figure.
The miss adds up every gap whichever way it ran, so a forecast that errs high and low in turn still shows a large miss.
Why a forecast miss matters to the grid
Most electricity in Germany is sold the day before it is used, in an auction that closes at noon, with each trader bidding on its own forecast of the weather. By 18:00 the four grid operators publish theirs: the forecast of the next day's wind and solar output this page measures. Wind and sun then arrive as the weather allows. The gap between the forecast and what the turbines and panels produce has to be closed on the day itself, by trading in the intraday market and, in the last minutes, by the grid operators' balancing power.
The miss shown here adds up the gaps quarter-hour by quarter-hour, ignoring their sign, and divides by what was generated, so it reads as a share of the output: a miss of a tenth means the forecast was off by a tenth of what was generated. Bias keeps the signs: positive when the forecast ran high, negative when it ran low. A forecast can have a large miss and almost no bias, when it errs high and low in turn.
Regional figures run higher than the national one. A forecast that is too high in one area and too low in another partly cancels in the national total, and a small fleet, such as onshore wind in the south-west, shows its misses as a larger share of a smaller output. Offshore wind is forecast for fewer, larger parks, so a single change in wind speed moves a large part of the output at once.
Questions
How accurate are wind and solar forecasts in Germany?
Over the 12 months to 2 November 2026, the grid operators' day-ahead forecast of German onshore wind output missed by 10% of what was generated, offshore wind by 17% and solar by 7%, according to SMARD, the grid regulator's data portal. Each miss adds up every hour's error, whichever way it ran.
Are wind forecasts worse in some parts of Germany?
Yes. Over the 12 months to 2 November 2026, the onshore wind forecast missed by between 11% and 26% in the four control areas, each the region one grid operator balances (SMARD). Misses in different areas partly cancel when they are added up, so the national figure of 10% is smaller.
How these numbers are made: Day-ahead forecast error.
Get an email when this section changes.